The change tracking feature in our software was a key feature in the Casey Hospital Expansion project delivered by Silver Thomas Hanley (STH). Change Tracking records all changes throughout the entire building process and also records by how much has it changed and by whom.
The Casey Hospital Expansion project (CHEP) is a $140 million construction of a new multi-storey tower wing and extension plus refurbishment to the existing hospital, which was originally constructed in 2004 as a PPP by the Plenary Health Consortium.
With a project size of 16,000m2, CHEP was the first large scale project on which STH utilised the dRofus platform.
"dRofus was an excellent QA tool. Having the dRofus database linked to Revit gave us the ability to validate what should be drawn and track changes with the logs." said David Collins – Associate and Project Architect.
Read our case study now to learn more about how this feature has helped delivered the Casey Hospital Expansion project.