Skip to content
dRofus11/23/18 12:00 AM

Change Tracking - The Key to Casey Hospital Expansion Project

20170713_Artist Impression-View to Entry_rw_edit

The Casey Hospital Expansion project (CHEP) is a $140 million construction of a new multi-storey tower wing and extension plus refurbishment to the existing hospital, which was originally constructed in 2004 as a PPP by the Plenary Health Consortium. 

With a project size of 16,000m2, CHEP was the first large scale project on which STH utilised the dRofus platform.

"dRofus was an excellent QA tool. Having the dRofus database linked to Revit gave us the ability to validate what should be drawn and track changes with the logs." said David Collins – Associate and Project Architect.

Read our case study now to learn more about how this feature has helped delivered the Casey Hospital Expansion project.


DOWNLOAD CASE STUDY 

COMMENTS

RELATED ARTICLES